The bid packet has been placed with the North Coast Builders Exchange.  Close of bids will be in early June.  Contact the NCBE or the project manager for particulars.  The contractors bid walk was held on Wednesday, May 20th.
Notice to Potential Bidders
Bidding has been suspended until all package components are processed and received by the JCC.  Bidding will be opened when dates posted by the North Coast Builders Exchange concur with bid date information posted on this page.  This site will indicate the actual bidding dates when the bids package has been finalized.  Bids will be calculated for the June - October 2009 construction window. Join the Jenner Bridge group posted below on Google for distributed updates on our side of this process.  Thanks for your interest and patience.

JCC Bridge and Stream Restoration Contacts List
Jenner Community Club
P.O. Box 1
Jenner, CA  95450
David Kenly, JCC President
707-865-1616
9am-4pm
MTTF
Don Paul, JCC Project Oversight 707-632-5458 TBA
Malcolm Sibbernsen, JCC Project Oversight 707-865-9096
9am-4pm
MWTF
Prunuske-Chatham, Incorporated
400 Morris Street - Suite G
Sebastopol, CA  95472

Aimee Crawford, Project Manager
707-824-4601 ext 119
8am-5pm
M-F
Denis Ruttenberg, Stream Restoration Engineer
707-824-4601 ext 120 8am-5pm
M-F
California Emergency Management Agency (CALEMA)
[was: California Governor's Office of Emergency Sevices]
Response and Recovery Division
3650 Schriever Avenue
Mather, CA  95655
Robert "Bob" Lawson
916-845-8231 W
916-838-3881 Cell

JCC Bridge Documents Index
Click on item to download

Soils Report w/ Affirmation (09MAY08)
Justiniano
13APR06
Final

Hydraulics and Hydrology Rpt
PCI
MAY07
Final

Bridge Figures
PCI 14SEP07


Bridge Plan Memo
PCI 14SEP07


JCC Bridge Project Schedule (REVISED)
PCI MAY08


Jenner Gulch Biological Opinion
NOAA
16FEB07
Final

Jenner Creek Biological Opinion
USFWS
25FEB08
Final

JCC Bridge Replacement Project on Jenner Creek
PCI 16JUL08


JCC Bridge Calculations
Pacific Bridge
03JAN09
First

JCC Bridge Calculations - Revision 1
Pacific Bridge
03JAN09
Revised 23JAN09

JCC Bridge Drawings Pacific Bridge 12JAN09
First

JCC Bridge Drawings - Revision 1
Pacific Bridge 12JAN09 Revised 23JAN09

JCC Bridge Drawings - Revision 2
Pacific Bridge
12JAN09
Revised 24JAN09

JCC Bridge Structure General Notes
Pacific Bridge 19JAN09

JCC Bridge Longetudinal Section (Upstream)
Pacific Bridge 19JAN09

JCC Bridge Footings MathCad
Pacific Bridge 19JAN09
Google Groups
Subscribe to Jenner Bridge
Email:


Visit this bidder group