| The bid packet has
been placed with the North Coast Builders Exchange. Close of bids
will be in early June. Contact the NCBE or the project manager
for particulars. The contractors bid walk was held on Wednesday,
May 20th. |
| Notice to Potential Bidders |
| Bidding
has been suspended until all package components are processed and
received by the JCC. Bidding will be opened when dates posted by
the North Coast
Builders Exchange concur with bid date information posted on this
page. This site
will indicate the actual bidding dates when the bids package has been
finalized. Bids will be calculated for the June - October
2009 construction window. Join the Jenner Bridge group posted below on
Google for distributed updates on our side of this process.
Thanks for your interest and patience. |
| JCC
Bridge and Stream Restoration Contacts List |
||||||||
| Jenner
Community Club P.O. Box 1 Jenner, CA 95450 |
David Kenly, JCC
President |
707-865-1616 |
9am-4pm MTTF |
|||||
| Don Paul, JCC Project Oversight | 707-632-5458 | TBA |
||||||
| Malcolm Sibbernsen, JCC Project Oversight | 707-865-9096 |
9am-4pm MWTF |
||||||
| Prunuske-Chatham,
Incorporated 400 Morris Street - Suite G Sebastopol, CA 95472 |
Aimee Crawford,
Project Manager |
707-824-4601 ext
119 |
8am-5pm M-F |
|||||
| Denis Ruttenberg,
Stream Restoration Engineer |
707-824-4601 ext 120 | 8am-5pm M-F |
||||||
| California
Emergency Management Agency (CALEMA) [was: California Governor's Office of Emergency Sevices] Response and Recovery Division 3650 Schriever Avenue Mather, CA 95655 |
Robert "Bob" Lawson |
916-845-8231 W 916-838-3881 Cell |
||||||
| JCC
Bridge Documents Index Click on item to download |
||||||||
| Soils
Report w/ Affirmation (09MAY08) |
Justiniano |
13APR06 |
Final |
|||||
| Hydraulics
and Hydrology Rpt |
PCI |
MAY07 |
Final |
|||||
| Bridge Figures |
PCI | 14SEP07 |
||||||
| Bridge Plan Memo |
PCI | 14SEP07 |
||||||
| JCC Bridge Project Schedule (REVISED) |
PCI | MAY08 |
||||||
| Jenner
Gulch Biological Opinion |
NOAA |
16FEB07 |
Final |
|||||
| Jenner
Creek Biological Opinion |
USFWS |
25FEB08 |
Final |
|||||
| JCC Bridge Replacement Project on
Jenner Creek |
PCI | 16JUL08 |
||||||
| JCC Bridge
Calculations |
Pacific
Bridge |
03JAN09 |
First |
|||||
| JCC Bridge Calculations - Revision 1 |
Pacific
Bridge |
03JAN09 |
Revised 23JAN09 | |||||
| JCC Bridge Drawings | Pacific Bridge | 12JAN09 |
First | |||||
| JCC Bridge
Drawings
- Revision 1 |
Pacific Bridge | 12JAN09 | Revised 23JAN09 | |||||
| JCC Bridge Drawings - Revision 2 |
Pacific
Bridge |
12JAN09 |
Revised 24JAN09 |
|||||
| JCC
Bridge Structure General Notes |
Pacific Bridge | 19JAN09 | ||||||
| JCC
Bridge Longetudinal Section (Upstream) |
Pacific Bridge | 19JAN09 | ||||||
| JCC Bridge Footings MathCad |
Pacific Bridge | 19JAN09 | ||||||
|
||||||||